On a construction site, what must be done to deenergized circuits before work?
- Turn off one switch and tell the crew
- Make them inoperative and tag every energizing point
- Post one sign at the job trailer
🔒 The answer is for AhaBulb members. Members see the answer, why it's right and the official sources for every card of Stuff Every Worker Should Know, plus timed practice exams.
The first 50 cards of every test are free to play.
Like this card?
References
- 29 CFR 1926.417(b) www.law.cornell.edu/cfr/text/29/1926.417 Checked 2026-10-11.
Think this answer is wrong? Tap "Challenge this answer" on the card in the game and tell us why.
More stuff everyone should know
Workplace Safety (OSHA)Before working close to an electric power circuit, what protection is required?Workplace Safety (OSHA)What does a lockout device do that a tagout device does not?Workplace Safety (OSHA)What year did Congress pass the Occupational Safety and Health Act, the law that created OSHA?
That's stuff everyone should know.